Building a house and not sure what the sparky does between the slab going down and you getting the keys? It’s not just popping a few power points on the wall. A proper electrical fit-out runs in stages, each one tied to what the builder’s doing that week, and if you miss a step early on, it costs you later. This guide walks through the whole thing from first chat to final test.
Elite AC & Electrical has been wiring new homes around Adelaide for over 15 years. We’ve done more of these than we can count. Here’s how it usually goes.
What happens before any wires go in?
You need a plan. Not a vague idea. An actual plan.
Before a single cable gets run, we sit down with you or your builder and figure out where everything lives. Power points. Light switches. Downlights. Pendants. TV points. Data outlets. Outdoor lights. Sensor lights. Where the big appliances go-oven, cooktop, rangehood, air con, hot water unit, the works.
This is the time to think about stuff you might want later too. Solar down the track? EV charger in the garage? Run conduit now while the walls are open. Adding it later means cutting holes and patching plaster. Way more expensive.
We always tell people the same thing: you won’t regret putting in more power points than you think you need. Garage, hallway, pantry, outside near the barbecue area. It’s cheap and easy at rough-in. A pain later.
What’s rough-in? And why does it matter so much?
Rough-in is the first real stage. The frame is up. The roof is on. But there’s no plaster yet-just timber studs and empty wall cavities everywhere. This is when we pull all the cables.
We run cabling for every power point, every light switch, every light fitting. We run data cables for NBN and TV points. We run cables for air con, oven, hot water, cooktop. We set the mounting brackets for lights and the back boxes for switches. If there’s a security system or intercom going in, we run those cables now too.
For a standard single-storey house, rough-in usually takes a couple of days. It’s dusty and loud and the house looks like a mess. But this is the most important part. If a cable isn’t run now, it’s very hard to add it later.
What happens at fit-off?
Fit-off is the second visit. By now the plaster is up, the painters have been through, the kitchen cabinets are in, and the place finally looks like a home instead of a building site. Now we come back and put on all the stuff you can actually see.
We fit the power points and light switches. We install the downlights, pendants, and any feature lights. We connect up the oven, cooktop, hot water system, and air conditioning. We mount the switchboard and terminate every circuit into it. We install all the smoke alarms.
Another day or two for a standard house. By the end of fit-off, every light should work, every power point should be live, and every appliance circuit should be ready to go.
How is the switchboard set up?
The switchboard is the brains. It takes power from the street and splits it out safely around your house. Under the current wiring rules, every single circuit in a new home has to be protected by an RCD safety switch. Lights, power, oven, air con, hot water-everything.
We also put surge protection in the board. That stops voltage spikes from frying your appliances. And we always leave a few spare slots. You might want an EV charger one day. You might add a shed or a pool circuit. If the slots are already there, it’s cheap. If not, you’re up for a board upgrade.
What’s the testing and certification bit?
Once everything’s installed, we test the lot. Every circuit. Every outlet. Every switch. We check that all the RCDs trip within the required time, measure earth fault loop, test polarity and insulation resistance, and confirm the main earth and bonding are solid.
After that’s done, you get a Certificate of Compliance for Electrical Work (CCEW). That piece of paper proves the work was done by a licensed electrician to Australian Standards. You’ll need it for insurance, for selling the house later, and just for your own peace of mind. No certificate means no proof the job was legal.
What about air con, security, and smart home stuff?
Most new Adelaide homes have more than just basic electrics. Ducted reverse cycle air con, security cameras, intercoms, alarm systems, Wi‑Fi access points-these all need cables run during rough-in.
Elite AC & Electrical handles both the electrical and the air con in house. That means one crew running all the cables, not two different companies tripping over each other. Ducted air con needs its own circuit from the board. CCTV cameras need data cables pulled to every camera spot. Wi‑Fi points need Cat6 cabling to the ceiling. If you want smart lighting or a video doorbell, now’s the time to get those cables in.
How long does it all take?
For a standard single‑storey house, the full fit-out takes maybe 3 to 5 working days spread across the build. Rough-in lines up with the framing. Fit-off lines up with the finishing stage. Testing happens right at the end, just before handover.
Delays usually happen when the builder’s schedule slips or when someone changes their mind about fixture locations too late. The earlier you lock in your layout, the smoother it goes.
What stuff should I decide early?
The more you sort out before rough-in, the fewer regrets you’ll have. Here are some things people often forget until it’s too late:
- Extra power points in the garage, pantry, hallway, and outside
- USB outlets in bedrooms and near the kitchen bench
- Sensor lights for paths and driveways
- Conduit for future solar, battery, or EV charger
- Data cabling to a central spot for NBN and Wi‑Fi
- Feature lights-pendants over the island bench, strip lights in alcoves
It’s way cheaper to add another power point or run an extra data cable now than to try and do it after the plaster is up.
What’s it going to cost?
Hard to give a single number because every house is different. But for a normal 150 to 180 square metre home, you’re usually looking at somewhere between $8,000 and $15,000 for the full electrical fit-out. That’s the switchboard, all the cabling, all the points and switches, all the lighting install, appliance circuits, data and TV points, smoke alarms, testing, and certification.
Things like air conditioning circuits, EV charger rough-in, smart home automation, and CCTV cabling cost extra. Elite AC & Electrical gives upfront pricing before any work starts. No vagueness. No surprises later.
Stuff people ask us all the time
Do I need to be there during rough-in?
Not essential, but a quick walk-through beforehand with your sparky makes a big difference. Marking out where switches and points go takes 30 minutes and stops silly mistakes.
What if I forget something?
It can be fixed. But it’ll cost more. Adding a power point after plaster means cutting, patching, and painting. During rough-in, it’s a five-minute job.
How many power points should a new home have?
More than you think. Two double outlets per bedroom at least. Four in the living area. Six in the kitchen, including ones for the fridge, microwave, and rangehood. At least two doubles in the garage.
Is three-phase power worth it?
For most new places, yes. It gives you way more capacity for induction cooking, big air con, EV charging, and future solar and batteries. Swapping later is expensive.
Do smoke alarms have to be hardwired?
Yes. New homes need interconnected hardwired smoke alarms with battery backup. We handle that as part of fit-off.
Does Elite AC & Electrical do everything?
Yeah. Planning, rough-in, fit-off, testing, cert. Air con, CCTV, intercoms, data, smart home. One team. No juggling multiple tradies.
Bottom line
A full electrical fit-out for a new home happens in clear stages. Planning first. Rough-in while the walls are open. Fit-off once the paint is dry. Testing and certification at the end. Each stage depends on the last, and cutting corners early comes back to bite you.
If you’re building in Adelaide, Glenelg, Norwood, Prospect, Unley, Mawson Lakes, Salisbury, or anywhere around SA, Elite AC & Electrical has been at this for over 15 years. Licensed, insured, upfront pricing, and we actually answer the phone.
Give us a call or book online. Let’s get your new home wired properly from the start.